Step 1: Find the real load

List everything that will be on the UPS: firewall, router, core and access switches, NVR, servers, NAS, phone system, Wi-Fi controller. Then find how much power each one actually draws.

The label on a power supply shows its maximum, not what the device uses. A server with an 800 W power supply may draw 200 W on a normal day. Better sources, in order:

  1. The UPS display. If the equipment is already on a UPS, most units show the load in watts or as a percentage.
  2. The device itself. Many servers, switches and PDUs report power draw in their management page.
  3. The datasheet. Look for typical or maximum consumption, not the power supply rating.

PoE switches need special attention. A switch powering cameras, phones and access points draws its own power plus everything it delivers over the cables. A 24-port switch feeding 16 cameras at around 6 W each is delivering roughly 100 W to the cameras on top of its own consumption. Check the switch's PoE usage, not just its idle figure.

Step 2: Understand VA and watts

Every UPS has two ratings. VA (volt-amperes) is apparent power. Watts are the real power your equipment uses. The ratio between them is the power factor.

A UPS sold as "1500 VA" might be rated 900 W, or 1,350 W, or 1,500 W, depending on its design. Smaller desktop and line-interactive units are often rated at around 0.6 to 0.7 of their VA. Many modern online units are rated at 0.9 to 1.0.

Your load must fit within both ratings, and in practice the watt rating is the one you hit first. If you only remember one thing from this guide, it is this: read the watt rating.

Step 3: Leave headroom

Do not size a UPS to run at 100%. There are three reasons:

  • Growth. Next year there will be more cameras, another switch, a second server.
  • Start-up surges. Equipment can draw more briefly when it powers on, especially when everything restarts together after a cut.
  • Runtime. A heavily loaded UPS drains its batteries much faster. More on that below.

A practical rule: add expected growth to today's load, then choose a UPS whose watt rating keeps that total at or below about 80%.

Step 4: Decide what the runtime is for

"How many minutes do we need?" depends on what happens during those minutes.

  • Bridging to a generator. The UPS only has to carry the load until the generator starts, stabilises and takes over, plus a margin in case it does not start first time. Many sites aim for at least 10 minutes.
  • Clean shutdown. If there is no generator, the UPS must keep servers and storage running long enough to shut down in order. Measure how long your shutdown actually takes and add a margin. The UPS should trigger it automatically through a network card or software.
  • Riding out a cut. If you want the network to stay up through a scheduled cut of an hour or two, you are buying a lot of battery. That is a legitimate choice for a reception desk, a security room or a clinic, but it is a different budget.

Many sites combine these: long runtime for the core network and the gate, a clean shutdown for the servers.

Step 5: Estimate runtime properly

A battery's energy in watt-hours is voltage × amp-hours. Eight 12 V 9 Ah batteries in series hold 96 V × 9 Ah = 864 Wh. Dividing that by a 1,200 W load suggests about 40 minutes.

The real answer is lower, because lead-acid batteries deliver less of their rated capacity when discharged quickly. Battery Ah is usually rated over 20 hours; drain it in 20 minutes and you get far less. Peukert's law describes this, and our UPS runtime calculator uses it. For that example it estimates about 23 minutes, not 40.

Two practical consequences:

  • Halving the load more than doubles the runtime. Taking non-essential equipment off the UPS is often the cheapest way to gain minutes.
  • The manufacturer's runtime chart beats any formula. Every serious UPS has one for each battery configuration. Use it.

If you need more runtime, most rack and tower UPS units accept external battery packs. Each identical pack adds another set of batteries in parallel.

Step 6: Choose the right type

There are three common designs:

  • Standby (offline). The load runs on mains until the power fails, then switches to battery. Cheap, fine for a single PC, not ideal for a network rack.
  • Line-interactive. Adds voltage regulation, so it handles sags and surges without going to battery every time. A sensible choice for many small racks with stable mains.
  • Online double-conversion. The load always runs from the inverter, isolated from the mains. There is no transfer time, and the output stays clean when the input is not.

Where a generator is involved, online double-conversion is usually the better choice. Generators can produce voltage and frequency that wander, especially under changing load, and an online UPS isolates sensitive equipment from that. Also check the output waveform: some modern power supplies do not run well on the stepped "simulated sine wave" of cheaper units. Pure sine wave output avoids the issue.

Step 7: Plan for battery ageing

Most UPS units use sealed lead-acid (VRLA) batteries. They are typically designed for three to five years in ideal conditions, but two things shorten that:

  • Heat. A common rule of thumb is that battery life roughly halves for every 8 to 10 °C above 25 °C. A rack in a hot room, or a server room whose air conditioning stops during every power cut, eats batteries.
  • Cycling. Frequent deep discharges from regular power cuts wear batteries faster than occasional short ones.

Batteries are generally considered due for replacement when their capacity falls to about 80% of new. The danger is that a UPS with aged batteries looks perfectly healthy until the first long cut. Record the installation date on each battery set, run the UPS self-test regularly, and plan a controlled runtime test once a year at a quiet time.

Step 8: Do not forget the edges

The rack is rarely the whole picture. Check:

  • Floor and building switches. If they are not protected, cameras, phones and access points drop even when the core rack is fine.
  • The internet router and modem. Often plugged into the wall next to the rack.
  • Gate equipment. Readers, turnstile controllers and the switch that serves them.
  • Cooling. Air conditioning is rarely on the UPS. If it stops, temperature becomes the limit on runtime. A temperature sensor with alerts tells you before the servers do.

A worked example

A rack holds a firewall (40 W), a core switch (50 W), two PoE switches each feeding 12 cameras (about 110 W each including the cameras), an NVR (80 W), a small server (150 W) and a NAS (60 W). Total: about 600 W.

Allow 25% for growth: 750 W. Keep that at or below 80% of the rating: the UPS needs at least about 940 W. A 1.5 kVA online unit rated at 1,350 W leaves comfortable room.

With a 48 V battery bank of four 12 V 9 Ah batteries, the runtime estimate at 600 W is around 23 minutes when new: enough to bridge to a generator or to shut the server down cleanly. Adding one matching external battery pack takes the estimate to roughly 50 minutes. Check both figures against the manufacturer's chart for the specific model.

Next guide Guide 03 · Managed IT What an IT SLA should include, and what to ask before you sign Response versus resolution time, coverage hours, exclusions, escalation and reporting. Twelve questions to ask before you sign an IT support contract. 6 min

Back to top

Next step

Tell us what has to keep working.

A few minutes with the SLA Advisor gives us enough to come back with a plan and a quote. Or send us a message on WhatsApp.

Get your SLA recommendation WhatsApp +20 110 006 3316

On-site times guaranteed in Alexandria city: 8h Essential · 4h Business · 2h Mission-Critical.